FRANK production blog 82

Todays FRANK update are some background designs. Mostly the introduction background and the plants that live in FRANKs apartment. While I knew I wanted a room full of plants outside of roses a cactus and some sunflowers a didnt really know what else I wanted to include. Now that I have finished coloring and compositing most of the scene I felt it was time I sat down and picked what plants I was gonna draw.

Left side redesign background

Right side redesign background

Color test for the Plants of the Left

Line up of Plants

FRANK production blog 81

Todays FRANK update is a small one. I have been very busy with life matters so I haven’t been able to put much work into the project last month and this month. However its still moving along just as at a slower pace. Below is a screen shot of the opening scene. Its taking me a long time to color and comp this scene. Its longer then I expected it to be which feels nice. There is still much work to be done on this scene, I will update once I have had more time to devote to it

frank production blog, 2d animation, after effects animation, independent film

FRANK production blog 80

Hey Ya’ll its been a while, I have been very busy chipping away at very important scenes. Here is a quick update on what i have been doing.

frank production blog, 2d animation blog, animation film update, animation photoshop

When I first started coloring this scene I didnt realize there was a design problem (can you spot it?), I ended up coloring the entire scene and when I was in post I saw the error and so I need to update the animation.

frank production blog, 2d animation production blog, 2d animation, photoshop animation

I went back into TVPaint and cleaned up the animation and design. Took a few days but it wasn’t to difficult. It was nice jumping back into some animation after months of coloring. I had last touched this scene 2 years ago. The most challenging thing was remembering how I had set up the file and trying to update it without messing it up

frank production blog, 2d animation production blog, 2d animation, photoshop animation

I have been coloring this scene, Im almost done but there is still a lot to do cause its a very long scene. Almost 30 seconds of animation (broken into 3 actions but its run on. Its gonna look so good when its complete. This is possibly the biggest and last challenge for the animation of the film. The next step Post is gonna bring a whole different set which Im looking forward to cause it means progress!

FRANK production blog 79

Todays blog post are a few screen shots of the introduction scene. I had been working to clean up the animation on this very long scene. I am happy to say about 1 week ago I finished. So I been working on coloring the 89 frame scene. It will without a doubt take about 2 or 3 months to complete due to its size and complexity. This is a full body shot which mean a lot of coloring and outlining. Never the less it will be fun and I am very close to being done with all animation and coloring.

frank production blog, tvpaint animation frame, 2d animation screen shot

FRANK opening the door

frank production blog, 2d animation art

FRANK production blog 78

Todays production update are some screen shots from the intro scene, Im still cleaning up the scene. Im almost done and cant wait to move onto the coloring phases

FRANK production blog 77

Todays FRANK update are some screen shots from a walk cycle and turn. This is one of the first scenes of the film, I haven’t touched it in over two years so its been a bit of a challenge. It took about one month to complete from clean up to color to composite. It been really nice to finish a full body shot of the main character. Im still working on the first part of the scene, but Im excited to be done in a few weeks. This film is coming together really well. Lets hope I can get it done this year

FRANK production blog 74

Todays FRANK update are some images of our guy FRANK. In this scene his upper body moves, So I decided to split him in half only color the top half in order to save time and to keep the lines neater. It was a fun scene, originally i was gonna color all of him every frame, but then I realized I didn’t have to. Like a true 2D animator I got to cheat in this scene.

Im still working on this scene the background has been very challenging more me to complete. Its been a very slow grind, however I will over come and when I do I’ll have a nice fat post to share!

FRANK production blog 73

Todays production update is scene16A. This shot took some time because I hadn’t done any rough animation since the first draft of the animatic. I had a few color sketches but no more then 4-5. However despite not having a ton of concept art for the idea I knew what I wanted since the very beginning. I didn’t see a reason to change it much, the biggest experimental’s where the colors and the timing. So it was pretty easy to piece together but it did take some time to animate due to all the layers it comes with. I have to change a few timing issues, its a match cut so it needs to read right. I will come back to a final pass soon enough.

concept art for animation, photoshop file for animation film, frank production blog

Photoshop color frame

concept art for animation film, frank production art, photoshop file from animation film

Photoshop color frame and layer

concept art for animation film, animatic still from animation film, frank production blog

Animatic still from the scene

after effects frame from the film, frank film production still, frank production blog, screen shot of adobe after effects

After Effects still from the scene